Midtherm UV - UV-C Air Purifiers
MT250
MT250 view 1
MT250 view 2
MT250 view 3

Introducing the MT250

Wall Mount Unit - For Easy Installation

UVC Only unit, easy to wall mount, the original, designed during covid for quick installation.

NHS NETB 2023/01B

Capacity

250 m3/hr

Weight

20kg

Dimensions

1260mm x 315mm x 200mm

UVC Lamps

2 x 75w Phillips Signify

Sound Level

40-54db (min-max speed)

Power

250w at 230v

Available Finishes

Gloss WhiteMatt Black
Key Features
  • Easy wall mounting installation
  • Quick deployment capability
  • NHS Lab Bio-Validated
  • HTM03 Compliant
  • Installed in Multiple NHS Trusts
  • Designed and Made in the UK
Special Features
  • Filterless UV-C only design for minimal maintenance
  • Original design created during COVID-19 pandemic
  • Proven track record in NHS healthcare settings
  • Compact wall-mount design for space-constrained areas

Model Specification

SettingAirflow CapacityNoise LevelPower ConsumptionDeactivation Rate*
Min Speed Setting125m³/h40dB0.180 kW99.99%
Normal Speed Setting200m³/h48dB0.200 kW99.9%
Max Speed Setting250m³/h54dB0.250 kW99%

* Confirmed through efficacy testing conducted by an NHS Lab.

Designed to be fully compliant with the new Draft NHS UVC Standard due for release imminently.

Real-World Case Studies

See the MT250 in action at real facilities:

St Teresa's School installation

St Teresa's RC Primary School - Merton

Independent air quality testing by the Institution of Mechanical Engineers (IMechE) showed 41-87% microbe reduction across 8 classrooms, creating a healthier learning environment for students and staff.

Read Full Case Study →
Pride Hill Dental installation

Pride Hill Dental Surgery - Shrewsbury

NHS modelling study demonstrated 65% air circulation efficiency, eliminated fallow periods between patients, and achieved 2-year ROI payback through increased patient throughput in dental surgeries.

Read Full Case Study →
Maidstone Hospital RAPS Ward

Maidstone Hospital - Kent

Proof-of-Concept Phase: MT250 units on mobile stands were deployed to simulate the air changes that would later be achieved by the permanent in-duct system. This temporary installation proved the effectiveness before final specification, demonstrating how mobile units can serve as testing tools or temporary solutions while permanent systems are being designed and installed. Final installation achieved 80% airborne pathogen reduction validated by UKAS laboratory testing.

Read Full Case Study →

Installation & Technical Details

MT250 technical view 1

Interested in the MT250?

Contact us today to discuss your requirements

Cookie Consent

We use essential cookies to ensure our website functions properly. These cookies are necessary for basic site functionality and do not collect personal information. By continuing to use this site, you consent to our use of essential cookies in accordance with GDPR requirements.

We do not use tracking cookies, analytics cookies, or third-party advertising cookies. Your privacy is important to us.